Day-Ahead Trading of Electricity

Day-ahead trading of electricity refers to the buying and selling of electricity on the day before the actual production and delivery. Day-ahead trading either takes place on the spot market of the respective power exchange (often called day ahead market or day ahead auction) or through bilateral contracts between two parties - usually power trading companies - outside of the power exchange in over the counter (OTC) deals.

See more
KnowledgePower tradingEPEXEnergy TradingPower marketElectricity MarketKnowledge
Power Trading

Power trading refers to purchasing and selling power between participants in the energy industry . Various forms of power trading are possible depending on the market design, ranging from short-term trading to long-term power purchase agreements.

See more
KnowledgePower GridEntsoe-eEuropean gridKnowledge
Cross-Border Interconnectors

To turn national electricity grids into a large European electricity market, the various national transmission system operators (TSOs) need transit capacity for cross-border electricity trade. These border connection points, also called cross-border interconnectors, enable TSOs at international level to transfer electricity from one national grid to another. Only cross-border interconnectors can turn on-balance-sheet electricity trading into real, physical electricity deliveries. Their expansion is therefore a central starting point of the European Commission's electricity market policy and the implementation of the integrated European energy market.

See more
KnowledgeControl ReserveGrid BalancingEuropean gridKnowledge
Electricity Balancing Guideline (EBGL)

The Electricity Balancing Guideline (EBGL) was created by the European Commission to establish and regulate the smooth exchange of balancing energy across the internal borders of the European Union. This guideline, which came into force as Regulation 2017/2195, sets the framework for the stabilization of the electricity grid throughout the European electricity market system. The aim is a pan-European market for system services with a harmonized market design and non-discriminatory trading of balancing energy without barriers between markets. As a result, TSOs will be able to procure balancing power more efficiently, more reliably, and cheaper.

See more
KnowledgeMarket integrationElectricity MarketEuropean gridKnowledge
Liberalization and Unbundling of Energy Markets

The liberalization of the energy market means the opening of the electricity and gas market to free competition. This has broken up existing monopolies and opened the market to more participants. In most cases, liberalization was accompanied by unbundling, which made a distinction between generation, transmission and distribution/retail in the energy sector. The aim was to make electricity supply more efficient by integrating competitive forces where possible and by integrating regulation where necessary. In Europe, liberalization began in 1996 with the adoption of the first European Directive.

See more
KnowledgeData analysisVirtual Power PlantAlgorithmKnowledge
Artificial Intelligence

In recent years, Artificial Intelligence (AI) has gained relevance in a wide variety of sectors. However, defining the term poses some difficulties. Central to Artificial Intelligence is that it makes and implements decisions based on data (information) independently with regard to the set goals. The term artificial distinguishes AI from the "natural intelligence" attributed to humans and animals. Narrower definitions see AI as a branch of computer science that deals with machine learning and the automation of intelligent behavior. Still, the definition of intelligence remains vague and excludes other areas of research, such as robotics or linguistics.

See more
KnowledgeEnergy policyTransformationEnergy TransitionKnowledge
Carbon Bubble

The carbon bubble, also called CO2 bubble, is a theory that has its origin in climate and economic research. The term describes a possible overrating of companies that could only maintain their growth forecasts for the next few years by consuming fossil fuels on a scale that would violate the two-degree limit of the Copenhagen Treaty.

See more
KnowledgeEnergy TradingPhotovoltaicsTransformationKnowledge
PPA

A Power Purchase Agreement (PPA) often refers to a long-term electricity supply agreement between two parties, usually between a power producer and a customer (an electricity consumer or trader). The PPA defines the conditions of the agreement, such as the amount of electricity to be supplied, negotiated prices, accounting, and penalties for non-compliance. Since it is a bilateral agreement, a PPA can take many forms and is usually tailored to the specific application. Electricity can be supplied physically or on a balancing sheet. PPAs can be used to reduce market price risks, which is why they are frequently implemented by large electricity consumers to help reduce investment costs associated with planning or operating renewable energy plants.

See more
KnowledgeControl ReserveFrequency ControlEnergy TradingKnowledge
Merit order

In the energy industry, the merit order principle refers to the order in which power plants are deployed on an electricity trading platform in order to ensure the economically optimal supply of electricity to the grid. The merit order is based on the lowest marginal costs, i.e. the (operating) costs incurred by a power plant for the last megawatt hour produced. These variable costs are usually the fuel costs of conventional power plants. The merit order does not take into account the fixed costs of an electricity generation technology - for example, the construction or dismantling costs of a power plant are irrelevant for the order of deployment of power-generating capacity in the context of the merit order principle.

The power plants that continuously produce electricity at very low cost are the first to feed power into the grid in accordance with the merit order. Power plants with higher marginal costs are then added until demand is covered.

The merit order is just one possible model for describing a functional electricity market. It assumes that power plant operators are always trying to cover the cost of the next megawatt hour produced; they would not produce it otherwise. Power plants with low marginal costs can therefore offer a lower price for their electricity, and they are in turn called upon more often than power plants with higher marginal costs. The merit order is designed to shed light on how pricing works in a liberalized electricity market; it is not a fixed "law" or regulation that coordinates the use of power plants.

See more
KnowledgeDemand ResponseVirtual Power PlantElectricity MarketKnowledge
Load management

Electricity consumption is often referred to as ‘load’ in the energy industry. Load management is the active control of electricity consumption. It is also known as ‘demand side management’ or ‘DSM'. Often, it refers to controlling electricity consumption based on financial signals from the electricity market. Load management is an important part of the concept of a smart grid, whereby existing infrastructure is equipped with intelligent monitoring and control technologies. The result is a network of active and reactive loads. There are differences between load shifting, load reduction, flexible load, and load expansive control measures. The following article addresses load shifting and load reduction (or load shedding) in more detail.